Modular / Konrad planning guide

Make the modular office ready for people.

The building delivery date is only one milestone in opening a temporary project office. Access systems, the approach route, utilities, furniture and any required approvals need to come together around it. A readiness plan makes those dependencies visible before the trailer is set and the team expects to move in.

Start with the actual building information

Obtain the provider’s floor plan, exterior door positions, door swings and proposed finished floor elevation. Mark the building orientation on the site plan. Distinguish preliminary dimensions from measurements taken after setting; a small change in elevation or location can affect the access layout and furniture delivery.

The building provider should confirm its foundation, setup, transport and utility requirements. Konrad can coordinate the furniture and modular access scope around those requirements. Define who supplies each item and who accepts the completed work so the handoff does not depend on assumptions.

Plan an accessible route, not just a ramp

The U.S. Access Board’s guidance addresses slope, clear width, landings, handrails, edge protection and surface conditions. Its door guidance also addresses maneuvering space at entrances. Those are interacting requirements, which is why ordering a length of ramp alone does not establish compliance.

Have the project’s responsible design professional or other qualified reviewer evaluate the route from the appropriate arrival point through the entrance, including local requirements. Keep parking, fence bases, door swings and temporary services out of the reviewed route. Confirm the final configuration against actual site conditions.

  • Building plan, entrance elevations and door information.
  • Approach route, available footprint and surface conditions.
  • Straight or switchback layout, landings, stairs and platforms as required.
  • Project-specific accessibility, egress, structural and authority review.

Sequence access and furniture deliberately

Agree on a delivery sequence with the building provider and installers. Furniture may need a clear unloading area and suitable entry route before the team can place desks, tables and cabinets. A final ramp or stair position can also affect how large items enter the office.

Build a room-by-room furniture list from the people who will use the space. Note desk positions, meeting capacity, plan review, storage and break areas. Confirm power and data needs with the responsible providers; a furniture package does not include electrical or technology work unless the quote says so.

Make services and approvals explicit

Identify who is responsible for sanitation, water, waste, power, climate and cleaning where needed. Assign each service a required-ready date and a contact. Mobile Modular’s preparation guidance treats foundations, drainage, utilities and permitting as coordinated site issues rather than a single delivery task.

Temporary use does not establish an exemption from applicable requirements. The owner, contractor, building provider and qualified reviewers should resolve the required permits, inspections and acceptance steps. Konrad’s representative layouts and renderings support discussion; they are not approved construction documents.

Close out the setup before occupancy

Walk the finished arrangement with the responsible parties. Record outstanding items, confirm door operation and service contacts, and check that the intended routes remain usable. Keep the approved plans and product information available to the project team.

Send Konrad the building plan, target occupancy date, site photographs and known elevations to begin a coordinated quote. We can support one furniture or access order, or define a broader support package with qualified providers when the project needs it. Scope and availability are confirmed before commitment.

Your planning checklist

  • Building floor plan, orientation and door locations
  • Proposed and verified finished floor elevations
  • Approach route, surface and available access footprint
  • Responsible design and approval contacts
  • Furniture schedule and unloading route
  • Utility, sanitation and occupancy readiness dates
Download a printable copy

General planning information. Final product specifications, site requirements and responsibilities are confirmed for the assignment.

Related rental products

Modular ADA ramps and access systems in Central Texas.

Jobsite office furniture rentals across Central Texas.

Start with what you need

One rental. Several products. Let’s talk.

Share the location, timing and product. We’ll help define the next step.